Microsoft Project 3.0

Microsoft Project is a project management chart and gantt chart generator. It is a Microsoft Office family member, and built on the Office code, although it has never shipped with any Office suite.


Product type
Application Planning
Vendor
Microsoft
Release date
1992
Minimum CPU
286 (Win) m68k (Mac)
User interface
GUI
Platform
Windows MacOS
Download count
55 (9 for release)

Downloads

Download name Version Language Architecture File size Downloads
Microsoft Project 3.0 for Macintosh (3.5-800k) 3.0 for Macintosh English 2.8MB 1
Microsoft Project 3.0 for Macintosh [French] (3.5-800k) 3.0 for Macintosh French 2.91MB 1
Microsoft Project 3.0 for Macintosh [Swedish] (3.5-800k) 3.0 for Macintosh Swedish 2.94MB 1
Microsoft Project 3.0 for Windows (1992) (3.5-1.44mb) 3.0 for Windows English 4.1MB 1
Microsoft Project 3.0 for Windows (1992) (5.25-1.2mb) 3.0 for Windows English 7.27MB 2
Microsoft Project 3.0 for Windows (1992) [French] (3.5-1.44mb) 3.0 for Windows French 5.83MB 1
Microsoft Project 3.0a for Windows (1993) (3.5-1.44mb) 3.0a for Windows English 4.69MB 1
Microsoft Project 3.0a for Windows [Italian] (3.5-1.44mb) 3.0a for Windows Italian 4.28MB 1

Comments

Comments by